Cherry Street Ramp

Cherry Street Ramp

Mankato, MN

Assisting the City of Mankato with a study relative to parking needs resulted in the design of an innovative two-story ramp in the heart of downtown. The structure was designed to accommodate future retail, housing, and mixed-use spaces on successive floors.

A precast concrete system was selected as the structural system for the facility, allowing for expedient construction times and a flexible design medium. The 169 stall parking facility also serves as a transit station and major hub for the municipal bus system.

Three phases of Environmental Site Assessments were conducted resulting in the identification of contaminated soil. A Minnesota Pollution Control Agency (MPCA) plan was prepared and administrated for the proper remediation and disposal of the contaminated soils.

Public Works

  • Alta Wastewater Treatment Plant

  • Cherry Street Ramp

  • Fairmont Water Treatment Plant

  • Goodhue Water Tower

  • Humboldt Pavement Management Study

  • Kingsley Wastewater Treatment Plant

  • Lawton Water Treatment Plant

  • Madison Lake Regionalization

  • Mill Creek Bridge

  • Moville Comprehensive Plan

  • Sample Street

  • Second Street Ramp

  • Sibley Parkway

  • Sloan Wastewater Treatment Plant

  • South Front Street Reconstruction

  • Sumner Avenue Town Square

  • Trunk Highway 60 Downtown Reconstruction and Improvements

  • US Highway 14 Roundabout

  • US Highway 20

  • US Highway 59

  • West Lakeshore Drive